Melrose Health Laboratory
This project involved the refurbishment of two existing office space in Mount Waverly. Infinite Group provided the reconfiguration of mechanical and electrical services to provide a new creative work environment, along with creating a new laboratory facility at the rear of the building.
Compete Electrical Solutions
The electrical services required in this project included:
- Temporary lighting and power
- Site establishment
- Demolition and make safe of existing site
- Light and Power Rough in and fit off
- Extensive Data and communication extension and modifications
- Emergency and exit lighting system
- Electrical Integration with existing building
- Upgrade of Circuit protection
- Architecturally designed feature indoor and outdoor lighting
- Upgrade of Laboratory facilities
Air Conditioning Solution
The air conditioning services required in this project included:
- New Heating and cooling reverse cycle Split system Air Conditioning